Municipal Authority

THE FTMA WEBSITE HAS MOVED!

CLICK HERE

FOR THE WEBSITE


THE FTMA OFFICE HAS MOVED TOO!

FTMA is proud to announce the opening of the new Potato Garden Run Sewage Treatment Plant and Administration Building located at 90 Strouss Road, Imperial PA 15126. We have centralized our maintenance and administrative operations into one facility. 

The new facility will open to the public on January 15th 2018. We will be staffed between the hours of 8 a.m. - 4:30 p.m., Monday through Friday.

DIRECTIONS: Turn onto Moody Road which is across the street from the Shell gasoline station on Route 30. Proceed to the stop sign at the bottom of the hill. Make a left onto Potato Garden Run Road and then a quick right onto Strouss Road. The entrance to the building will be on the left. 

The FTMA drop box will remain at the Township Building. The mailing address will continue to be PO Box 409, Clinton. The telephone number, 724-695-3108, remains the same.
  
 
 
    


   
   
Responsibilities

The Findlay Township Municipal Authority’s field personnel are responsible for the daily operations of the water distribution system which includes:

  • Customer Service Troubleshooting
  • Fire Hydrant Repair and Maintenance
  • Meter Installations and Repair
  • Meter Readings
  • Routine Maintenance
  • Water Main Breaks and Repairs
A big tank with some trucks